The implementation status of the “Taipei FIR CNS/ATM Development and Implementation Program” is described below:
ATM System Implementation Plan:
1.
The 720-hour Confidence Test and Operational Test and Evaluation; OT&E were originally scheduled to be conducted from 1 March 2010 to 31 March 2010.
2.
In cooperation with CAA flight standards division and military air force, the ATMAS Flight test was conducted from 15 March 2010 and finished on 22 March 2010.